This job shown below required digging out the area and forming the foundation walls and stairs with a fully installed weeping system, including a water proofing membrane and then Delta MS. After backfilling the area, an entranceway was cut and readied for door installation.
In this walkout re-construction, the build was limited to existing permits and plans. The old walkout was removed, formed and concrete poured. To make the walkout more usable, the lip was enlarged to form a seating area and give the perception of a larger structure.